top of page

Window Delivery Day: How to Receive, Inspect and Install Your Window with One QR Scan

Oct 30
6 min read

Updated: Nov 12


Delivery day, start to finish: receiving, inspecting, uncrating and installing your OPTVUE window with one QR scan.

A pass-through window is one of the most rewarding upgrades you can make to a kitchen, bar or patio. Delivery day is where it starts, and the first 15 minutes after the truck pulls up matter more than most people expect.

Watch the short animation above, then read the steps below. They cover how to receive, inspect and uncrate your OPTVUE window, and how a single QR code on the side of the frame gives your installer everything needed to install it right.

Delivery day at a glance

  1. Be ready before the truck arrives. Delivery is curbside or tailgate, so plan the people or equipment to unload the crate.

  2. Start the 15-minute clock. The carrier allows about 15 minutes of free time to unload and inspect.

  3. Open one face of the crate and inspect the window before you sign anything.

  4. Sign the curbside delivery receipt only when the crate and window are in good condition.

  5. Move the crate upright to the opening where the window will be installed.

  6. Uncrate at the install site and keep the window protected until it goes in.

  7. Scan the QR label on the side of the window to open its Window Portal: signed drawings, installation instructions, build details, care and warranty.

Before the truck arrives

Your OPTVUE window ships fully assembled in a custom wood crate, by ABF Freight or an alternate carrier. When the shipment reaches the local terminal, the carrier calls to schedule a delivery day. Delivery is curbside: the driver brings the crate to the back of the truck, and you are responsible for unloading it and moving it.

  • Line up your crew. The crate weight is on your shipping notice. Standard windows (up to 90" wide and 84" tall) need enough people to lift safely. Oversized windows need machinery such as a forklift.

  • Have your tools ready: a charged cordless drill or impact driver with a Torx T-25 bit, and a phone camera.

  • Keep the crate upright. Never lay it flat, tip it on its face or set it on its side.

  • Be there yourself, or send someone you trust to inspect and sign.

The full checklist is on our shipment receiving instructions page.

The 15-minute inspection: open one side before you sign

From the moment the driver arrives, the carrier typically allows 15 minutes of free time to unload and inspect. Time beyond that can be billed, so be ready.

  1. Walk around the crate. Look at every side and photograph any damage from several angles.

  2. Open one face. With the T-25 bit, remove only the screws circled or marked in red, and lift off one panel. If one side is damaged, open that side.

  3. Inspect the window. Check the glass, frame, finish and hardware, and confirm the size and color match your order.

  4. Give the thumbs up only when everything looks right.

Homeowner and installer inspecting an opened OPTVUE window crate beside the delivery truck
Open one face of the crate and check the window with the driver before you sign anything.
Damaged? Refuse it. If you see visible shipping damage, broken or cracked glass, or anything severely wrong, photograph everything, put the crate face back on, write "REFUSED, DAMAGED, RETURN FREE ASTRAY" on the bill of lading and send it back. Then call OPTVUE right away at (760) 760-0110 or email info@optvue.com so a replacement can start manufacturing as soon as possible. Accepting or installing a damaged window means accepting it as is.

Signing the curbside delivery receipt

Only after the inspection passes, sign the delivery receipt as received in good condition. Your signature tells the carrier the crate arrived undamaged, so it is the step that protects your shipping claim. Never let anyone rush you into signing first.

Curbside delivery receipt on a clipboard being signed after inspection
Sign the curbside delivery receipt only after the inspection passes.

Moving the crate to the opening

Put the panel back on if the window won't be installed right away. Keep the crate standing upright and roll it to the install location on a flat dolly or with machinery, never on its face. Store it on firm, level ground, out of the weather, until your installer is ready.

Installer and helper moving an upright OPTVUE window crate on a flat dolly
Keep the crate upright and roll it to the opening on a flat dolly.

Uncrating at the install site

When it's time to install, remove the remaining crate panels with the same T-25 bit and set the window on padded blocks next to the rough opening. Leave protective materials on until the window is ready to set.

Installer uncrating an OPTVUE gas strut window next to the rough opening
Uncrate at the install site and set the window on padded blocks beside the opening.

Scan the label: every window has its own online portal

Phone scanning the QR label on the side of an OPTVUE window frame
Every OPTVUE window carries a QR label on the side of the frame.

This is where OPTVUE delivery is different. Every OPTVUE window ships with a QR code label on the side of the frame. Scan it with any phone or tablet and it opens that window's own Window Portal.

There's no login, no app and no hunting through email attachments. It's a clean, mobile page made for the job site, showing:

  • Window drawings: the full shop drawings the customer signed and approved, with unit size, rough opening, jamb width, finish schedule and glass.

  • Installation instructions: the right manual for that window type, gas strut or motorized. LED lighting (patent pending) and screen guides appear only when the window includes those options.

  • Build details: exactly what was built for that opening: size, frame, sill, exterior and interior colors, glass and options.

  • Care and maintenance and the OPTVUE Limited Warranty.

  • Need help? One tap to call or email the OPTVUE team, with the job and window number ready.

On a job with several windows, each label opens its own window's page, and number buttons let the installer switch between windows on the same job.

OPTVUE Window Portal on a phone showing drawings, installation instructions and build details
The Window Portal: drawings, installation instructions, build details, care and warranty.

For installers

The drawings and the installation instructions for the exact window in front of you are one scan away, right at the opening. That means no guessing which revision is current, and no waiting on a callback before setting the window.

Installers setting an OPTVUE gas strut window into the opening at waist height
The right drawings and instructions at the opening mean the window goes in right the first time.

For homeowners

You get the same information your installer sees. Your order confirmation email links to your Window Portal, so you can share it with your installer before delivery and keep the care guide and warranty with the window for years.

An industry first in window information transparency

To our knowledge, no other window manufacturer gives every window its own scannable record like this. We believe the OPTVUE Window Portal is an industry first in information transparency for windows: the technical documentation travels with the product itself, attached to the frame, and opens in seconds on any phone.

For the people doing the work, that is a transformative change. Installers, contractors and inspectors no longer need to track down a salesperson, search an inbox or wait on a callback to confirm a rough opening, a finish or an installation step.

The signed drawings, the installation instructions for that exact window and its complete build record are in hand at the opening, at the moment they are needed, without picking up the phone. The result is fewer delays, fewer errors and a cleaner handoff from our shop to the job site.

For homeowners, the same documentation stays available for the life of the window, long after the installer has packed up.

Why delivery support matters when you compare window manufacturers

With many window orders, support ends at the bill of lading: a crate, maybe a PDF somewhere in an inbox, and a phone number. OPTVUE builds the support into the window itself. Every window has signed shop drawings, a per-window QR code that opens its own portal, published receiving instructions and care instructions, and the OPTVUE Limited Warranty.

When you compare pass-through windows, ask each manufacturer how your installer will find the drawings and installation instructions on the day the window goes in.

Frequently asked questions

How is an OPTVUE window delivered?

Fully assembled in a custom wood crate, by ABF Freight or an alternate carrier. Delivery is curbside or tailgate, and you unload the crate from the back of the truck.

How long do I have to inspect the delivery?

The carrier typically allows about 15 minutes of free time from arrival to unload and inspect. Time beyond that may be billed by the carrier.

What should I do if the window arrives damaged?

Do not accept it. Photograph everything, put the crate face back on, mark the bill of lading "REFUSED, DAMAGED, RETURN FREE ASTRAY," and call OPTVUE at (760) 760-0110 so a replacement can start right away.

What does the QR code on my window do?

It opens that window's Window Portal, a mobile page with its signed drawings, installation instructions, build details, care guide and warranty. No login or app is needed.

Can my installer use the Window Portal?

Yes. Anyone who scans the label on the window, or opens the link from your order confirmation, can view that window's information on any phone or tablet.

Family enjoying an open OPTVUE gas strut window bar top at sunset by the pool
The finished result: an open-air bar top, the pool and the backyard, connected.

Ready for your own delivery day?

Explore the OPTVUE gas strut window, design yours live in the LiveVue Window Designer, or request a quote. When your window arrives, your installer will have everything needed with one scan.


bottom of page